Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

General Info

Passenger Services

Tenders

News & Updates

Contact Us

 
Bookmark Mail this page Print this page
QUICK LINKS
25022016/165 21-03-2016
MALIGAON
Railway Budget (2016-17) highlights for N.E.Region

Railway Minister Shri Suresh Prabhakar Prabhu today laid the Rail Budget for the financial year 2016-17 at the Parliament. This year budget has lot to offer for Northeast region.

Railway Budget (2016-17) highlights for N.E.Region

§World class coaching terminal cum station at Agthori (North Guwahati) at an estimated cost of Rs.517 crores.

§Total plan outlay for N. F. Railway is Rs. 6241 crore, out of which Rs. 4308 crore is for construction of new lines, which is Rs. 146 crore more that the allocation for 2015-16.

§Rs. 515 crore has been allotted for Doubling of line which is Rs. 70 crore more than last year.

§Rs. 26 crore has been allotted for construction of bridges (excluding Bogibeel) compared to Rs. 19.25 crore allotted last year.

§The 11 National Projects in NE have been allocated Rs. 4208 crore, out of which Rs. 3808 crore has been earmarked for New Lines.

§For enhancing safety at Level Crossings, 306 unmanned level crossing will be manned. 207 of them are in NE region.

§Rs. 49,000 has been allotted for Reconnaissance Engineering cum Traffic  Survey for Pasighat – Tezu – Parashuram Kund new line.

§Rs. 15.77 lakh allotted for survey for construction of new line to link with Bangladesh Railway.

§Rs. 20 lakh allotted for Reconnaissance Engineering cum Traffic survey for new line between Sairang to Hbichhuah for port connectivity o­n Colodyna River in Myanmar as extension to Bharabi – Sairang new line (266km)

§Rs. 50,000 each for Survey for new line between Patharkandi to Kanmum (45 km) and Panisagar – Simanapur (80 km)

§Rs. 44.8 lakh for preliminary engineering cum traffic survey for new line between Dhubri and Mendipathar (120 km) with double line bridge over Brahmaputra at Dhubri.

§Rs. 92 lakh for Preliminary Engineering cum Traffic Survey for doubling between Lumding and Dibrugarh (343km)

§Reconnaissance Engineering cum Traffic survey for new line between Moirabari – Jagiroad (50km) – Rs. 5 lakh

§Reconnaissance Engineering cum Traffic survey for new line between Margherita  – Deomali (31km) – Rs. 3 lakh  

Total outlay for projects as per railway budget from 2009-10 to 2016-17

Name of region

Total outlay

2016-17 in crores

Average during (2009-10 to 2013-14) crores

Average during (2014-15 to 2016-17) crores

Increase 2009-13 vs 2014-2016

Assam and

NE states

5340.00 crores

2121.6 crores

5316.3 crores

151 %



(Pranav Jyoti Sharma)
CPRO/N.F.Railway




  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.