09042019/02212-04-2019
Maligaon
Engineering Department of N.F. Railway raises the permissible speed of 14 sections

Engineering Department of N.F. Railway has been able to raise the speed of 14 sections covering a length of 736 kms. during the financial year 2018-19. This raising of speed has led to saving of 133.47 minutes. Some important sections where the speed has been raised are as follows:

SN

Name of Section

Length (Track Km)

Speed raised

From Kmph

To Kmph

1

Katihar - Kumdepur

30.00

100

110

2

Katihar - Radhikapur

53.60

100

110

3

Aluabari - Siliguri

76.00

90

100

4

Fakiragram

46.99

50

75

5

North Lakhimpur-Sripani

81.46

80

100

6

Sripani - Murkongselek

72.32

75

100

           

It is to be mentioned that trains are allowed to run over designated sections of railway track with certain permissible speed, when the permissible speed of a particular track section is raised by suitable inputs to strengthen the track structure, the trains are allowed to run at a higher speed. This result in decreasing the travel time of the trains and the net saving of time required to travel over these sections. The Engineering Department has been able to provide systematic inputs to the track which has made the achievement possible.

            To this end N.F. Railway has been able to carry out a track renewal of 104 CTR units which is higher than the target stipulated by Railway Board. Almost 7.32 km of track has been deep screened by using mechanized screening arrangements while through fitting renewal has been done over a length of 402 km. In this connection as many as 4334 numbers of bridge sleepers have also been replaced by new sleepers in important bridges all over the zone. For greater safety of track, the zone has also resorted to flash butt welding of rail joints making a cumulative progress of almost 35,000 joints during the fiscal. Flash butt welding is a superior technology of welding which gives jerk free and safe welding of rails. It is also to be mentioned that in as many as 19 stations the permissible speeds in the platform lines have been raised from 15 kmph to 30 kmph leading to the saving of 57 minutes.


(Pranav Jyoti Sharma)
CPRO/N.F.Railway




  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.