Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

General Info

Passenger Services

Tenders

News & Updates

Contact Us

 
Bookmark Mail this page Print this page
QUICK LINKS
09904-05-2024
Maligaon
State-of-the-art laundry care centres set up at Guwahati, Katihar & Alipurduar, To cater the growing linen necessities in trains

In a bid to meet the escalating requirements of linens and provide best-in-class service to our passengers, a state-of-the-art laundry care centre had been set up Guwahati, Katihar & Alipurduar under the jurisdiction of N. F. Railway. The laundry at Guwahati has a production capacity of 16,000 bedroll packets per day. Similarly, Katihar and Alipurduar has a production capacity of 2,000 & 2,100 bedroll packets per day respectively. This will cater the growing linen requirements of Guwahati based trains like Amarnath Express, Lokmanya Tilak Express, Avadh Assam Express etc., Kamakhya based trains like Northeast Express, Brahmaputra Mail etc., Alipurduar based train like Sikkim Mahananda Express and Katihar based trains like Amrapali Express, Champaran Humsafar Express etc.

 The state-of-the-art laundry at Guwahati is a tunnel-based system which has numerous features, including the capability to handle large volumes of linen while optimising usage of water, power, steam and chemicals along with automatic transfer to subsequent stages. During the washing process, firstly soiled linens are weight and fed to the automatic conveyor of the machine. After that, by computerised operations the linens are loaded in a tunnel batch washer for thorough washing and cleaning. Robotic feeding is used to transfer the washed linens from washer to dryer. Next, water is extracted by way of pressing system which are equipped with a hydraulic press to facilitate maximum water extraction. Afterward, the washed linens are unloaded in a shuttle conveyor and dried through industrial dryers. Later, the linens are ironed in ironing system machine which automatically fold the linen after completion. Whiteness Meter is used for checking the standards of linens to ensure that the best quality of bedrolls are provided to passengers. After completion of the washing process the linen sets are packed in bags for supply to their respective trains.

 N. F. Railway is committed to provide clean and hygienic bedrolls to the passengers and setting up such mechanised laundry is an effort in this direction. N. F. Railway is also planning to set up such mechanised laundry in other locations under its jurisdiction as per necessities.



(Sabyasachi De)
CPRO/N.F.Railway




  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.